The site has no signal. The schedule still holds.
A field tab that keeps working with no connection, a Gantt where finish-to-start actually means finish-to-start, and an RFI register that will survive being read back to you in a dispute. The Engineering & Construction preset installs all three.
Preset: Engineering & Construction · 3 extensions installed at setup
What changes, in the hours it actually changes.
06:50 — the crew opens the Field tab in a basement
No bars, no problem. The Field tab is mobile-first and keeps working without a connection: work gets marked, notes get written, and everything lands in a per-device queue. When signal returns the queue reconciles — and where two people changed the same thing, the conflict is surfaced for a human to settle, not silently swallowed by whoever synced last.
13:20 — a prerequisite slips and the plan tells the truth
On the Hard-Dependency Gantt, finish-to-start is a rule rather than a warning. Drag a bar somewhere illegal and it refuses or warns instead of quietly letting you draw an impossible programme, and a real slip cascades to everything downstream with an audit row explaining what moved and why.
16:05 — the RFI is raised properly the first time
A numbered register per project, attachment rules so the drawing actually comes with the question, and an ordered approval chain that walks submitted → under review → answered → closed. Each RFI links to the task it is blocking, so the schedule and the paperwork say the same thing.
Three extensions, switched on at setup.
Choose this industry during onboarding and the bundle is queued for you. Review it, drop anything you don't want, and the workspace initialises with the rest already working.
Offline Sync Protocol
A mobile-first Field tab built for a site with no coverage. Work continues offline into a per-device queue and reconciles when the connection returns.
- A Field tab designed for a phone in a hard hat
- Works with no signal at all
- A queue held per device, not per account
- Conflicts surfaced for a human, never swallowed
Hard-Dependency Gantt
Strict finish-to-start dependencies. The Gantt refuses or warns on an illegal drag and cascades downstream moves when something genuinely slips.
- Finish-to-start enforced, not merely flagged
- Illegal drags refused or warned on
- Downstream tasks cascade automatically
- A sweep ripples real slips and writes an audit row
RFI Workflows
A numbered RFI register per project with attachment rules, an ordered approval chain and a status lifecycle you can point at in a meeting.
- Numbered register, one per project
- Attachment rules so the drawing comes with the question
- An ordered approval chain
- Submitted → under review → answered → closed, linked to tasks
The extensions sit on top of the whole product.
- Site and client meetings become owned action items on the right board
- The timeline grades progress from checklist pace against the next milestone — never from a column name
- RAID risks raised in a meeting land in the project's risk log
- Budgets, goals and deployments are tabs on the project, not another tool
- Autopilot detects a dependency ripple and tells the owners of the tasks it moved
The honest edges.
- The base Gantt in every Noots plan flags a dependency conflict but never moves anyone's dates for them. Automatic cascade is what the Hard-Dependency Gantt extension adds.
- The Field tab syncs work in the Noots data model. It is not a drawing-management or BIM system.
Built for the way your industry actually runs.
The ones buyers ask first.
Does the Field tab really work with no connection?+
Yes. It is mobile-first and keeps accepting work offline into a queue held per device. When the connection returns the queue reconciles, and anything that conflicts is surfaced for a person to resolve rather than resolved silently by whoever synced last.
How is this different from the Gantt everyone gets?+
The Gantt included with Noots detects a dependency conflict and flags it, but it never moves anyone's dates. The Hard-Dependency Gantt extension enforces finish-to-start: it refuses or warns on an illegal drag, and a real slip cascades downstream with an audit row recording the move.
Are RFIs numbered per project or across the org?+
Per project. Each project keeps its own numbered register, with attachment rules, an ordered approval chain, and a lifecycle from submitted through under review and answered to closed.
Can we turn one of these off?+
Any of them, at any time, from Org settings. Disabling an extension removes its surfaces and stops its background jobs on the server while preserving the data it already wrote — so an RFI register does not vanish because someone toggled a switch.
Let your meetings run the project.
Connect Noots once and watch every conversation turn into updated boards, written summaries, and hours handed back to your team.
Free to start · No credit card required
